How far ahead is closing scheduled for new build?

tag
tooleman694
Valued Contributor

Re: How far ahead is closing scheduled for new build?

We had snow and rain in Dec and it delayed the shipping of our Stone and Brick. And then they had to tear into the foundation to fix a pipe and that was another delay, but even with that we are still ahead of schedule.

Message 21 of 24
Mike_B03
Valued Contributor

Re: How far ahead is closing scheduled for new build?

No snow here, not much rain either. Smiley Tongue

 

I've always wondered about the rain though, isn't it bad for the house if it rains on the bare wood frame? I mean there is no way around it but still seems odd.

Message 22 of 24
JM-AM
Valued Contributor

Re: How far ahead is closing scheduled for new build?

That crosses everyones mind at some point. Some builders try and wrap with plastic just not to delay things. But it cuts into their bottom line. Most just let the wood dry out before continuing.
Good Luck
May all your dreams and wishes become a reality!
Message 23 of 24
tooleman694
Valued Contributor

Re: How far ahead is closing scheduled for new build?

The roof goes on during framing and the windows, that will help a lot.