cancel
Showing results for 
Search instead for 
Did you mean: 

FEB 2015 CLOSERS

tag
andemalia
Contributor

Re: FEB 2015 CLOSERS


@Anonymous wrote:

Our lender will not take the PDFs of the tax transcripts from online.  We tried.  They only want them directly from the IRS when they request them.  The issue is also that the IRS has not updated the transcripts so that is the delay.  Once the transcript is updated it only takes them 2 days to get them.


Oh my... Oh well, it wll all be well in the end... Hang in there!!

01/15 EQ 663 TU 669 EX 674 09/14 EQ 653 TU 635 EX 651
10/13 EQ 579 TU 580 EX 598
BoA 1.5k I Cap1Sec 0.6k I Cap1 QS 6k I Synchrony 1k I Barclays 1k
- Goals - Refi car loan 24% to 15% 12/13
Buy a home spring 2015: in progress; Pay off car loan spring 2016 balance $6200
Message 51 of 242
andemalia
Contributor

Re: FEB 2015 CLOSERS


@Anonymous wrote:

How many of you go by your new house all the time?

 

We are building and have had access to the house since signing the contract on it.  We moved to an apt closer to the property so I could be at the site everyday and monitor the construction.  Its been and intense 7 months.  really intense.  We have 1000s of pictures of every step, every board inside our walls, every wire...everything.  Its been fun but its so stressful as we get closer!  This delay is definitely tough, but going by tonight and seeing what we need marked to be fixed in tomorrow's final walk through makes me happy there are 2 weeks left and not just 1.  I don't want to close while we still have tweaks needing to be done on it.

 

BUT I WANT TO BE IN MY HOUSE!!!  Smiley Very Happy


Wow, that is pretty intense... I dont know that we could stand the stress/excitment of a 7 months from scratch process!! Wheeww!! You guys are strong!

01/15 EQ 663 TU 669 EX 674 09/14 EQ 653 TU 635 EX 651
10/13 EQ 579 TU 580 EX 598
BoA 1.5k I Cap1Sec 0.6k I Cap1 QS 6k I Synchrony 1k I Barclays 1k
- Goals - Refi car loan 24% to 15% 12/13
Buy a home spring 2015: in progress; Pay off car loan spring 2016 balance $6200
Message 52 of 242
andemalia
Contributor

Re: FEB 2015 CLOSERS


@Anonymous wrote:
I've only seen it twice. Lol. Once at the first showing and again during the inspection

Same here. It's 40 mins away lol on the other side of town!

01/15 EQ 663 TU 669 EX 674 09/14 EQ 653 TU 635 EX 651
10/13 EQ 579 TU 580 EX 598
BoA 1.5k I Cap1Sec 0.6k I Cap1 QS 6k I Synchrony 1k I Barclays 1k
- Goals - Refi car loan 24% to 15% 12/13
Buy a home spring 2015: in progress; Pay off car loan spring 2016 balance $6200
Message 53 of 242
andemalia
Contributor

Re: FEB 2015 CLOSERS


@Anonymous wrote:

My wife and I closed yesterday.  The entire process for us took almost exactly one month, and even that felt like years.  We drove by our home almost daily, we were so excited!!

 

I have been lurking for years now without ever posting.  These forums have done wonders for me in understanding my credit, by spending, and getting my finances back on track.  In the process of packing I found a credit report I pulled about 5 years ago, something like 574, 574, 608.  When I just had my credit pulled for the mortgage, it was 708.

 

Purchasing a home has been a life long dream.  This site has been such an invaluable resource.  Best of luck to those of you are in the process.  It's incredibly stressful and nerve wracking, but when you open that door for the first time as a home owner, it's all worth it!!! 


How inspiring!!!! Congrats to you guys and wishing the best in the new house. Blessings!!

01/15 EQ 663 TU 669 EX 674 09/14 EQ 653 TU 635 EX 651
10/13 EQ 579 TU 580 EX 598
BoA 1.5k I Cap1Sec 0.6k I Cap1 QS 6k I Synchrony 1k I Barclays 1k
- Goals - Refi car loan 24% to 15% 12/13
Buy a home spring 2015: in progress; Pay off car loan spring 2016 balance $6200
Message 54 of 242
Anonymous
Not applicable

Re: FEB 2015 CLOSERS

Dino81 congrats! !
Message 55 of 242
frugalQ
Valued Contributor

Re: FEB 2015 CLOSERS

I'm just like you newstart.

We like less than 5 mins from our build. We've been at it since September 2014....it's 7 months from contract to close.

I pass the house everyday. I've become friends with the building manager. I've taken pics of every step....starting from the day we signed the contract. It's been amazing to watch.

I stopped by this morning...the countertops were in. Stopped by this afternoon and all of the light fixtures were in and working, all of the electrical socket covers were installed. The floors go in on Monday.

I'm sooooo ready for march to get here.
AmEx Green NPSL | Amex BCP 16K | Citi Simplicity 10k | Discover IT 9K | Chase Slate 7.5K | Amex Hilton HHonors Surpass 7K | Capital One QuickSilver 6K | Home Depot 5k | Chase Freedom 4.5K | LOC 2.5K
Message 56 of 242
Anonymous
Not applicable

Re: FEB 2015 CLOSERS

These last 3 weeks have been miserable for me. Stressing over every email, every phone call. Waiting for the other shoe to drop. I can't possibly imagine 6 or 7 months of that. You are much more patient than I am

Message 57 of 242
Anonymous
Not applicable

Re: FEB 2015 CLOSERS

Closing set for the 27th. Had a few LOXs I had to send out last Tuesday. Now waiting...

Message 58 of 242
skigirl916
Established Contributor

Re: FEB 2015 CLOSERS

I sign my loan docs tomorrow, 2 weeks to the day after my offer was accepted! 

Message 59 of 242
Anonymous
Not applicable

Re: FEB 2015 CLOSERS

We hit a major speedbump. We had a collection show up on my credit report.  We have tofigure out what it does to our loan.  I talk to my LO tomorrow.

Message 60 of 242
Advertiser Disclosure: The offers that appear on this site are from third party advertisers from whom FICO receives compensation.